Lessons Learnt In Military Vehicle Capability Development And Acquisition

Lessons Learnt In Military Vehicle Capability Development And Acquisition?

Developing and acquiring military vehicle systems is a complex undertaking, demanding strategic foresight, engineering precision, and adaptive problem-solving. Over the past 20 years, numerous projects have highlighted both successes and challenges in delivering effective military capabilities. In Australia, key projects such as the M113 upgrades¹, the Bushmaster Infantry Mobility Vehicle², the Australian Light Armoured Vehicle (ASLAV) program³, and the Land 400 Phase 2 initiative⁴ offer critical insights into capability development. Meanwhile, in the U.S., programs like the Optionally Manned Fighting Vehicle (OMFV)⁵ and the Joint Light Tactical Vehicle (JLTV)⁶ showcase lessons in systems engineering and acquisition strategies. This blog post draws on these projects to highlight key technical challenges and lessons that can inform and improve future military vehicle capability development and acquisition processes to meet evolving demands in modern combat and operational readiness.

Managing Evolving Requirements and Scope Changes

One of the most significant challenges in military capability development is managing changing requirements and project scope. The M113 Armored Personnel Carrier upgrade, initially planned as a minor enhancement, evolved into a comprehensive overhaul due to shifting operational needs and strategic priorities¹. This led to delays, budget overruns, and increased complexity. Similarly, the U.S. OMFV program faced challenges due to evolving requirements that strained project focus and resources⁵. Both examples underscore the importance of a robust requirements management framework capable of adapting to change without destabilizing the project. Effective systems engineering demands early and continuous stakeholder engagement, disciplined change control, and a clear understanding of evolving mission needs to prevent scope creep.

Complex Systems Integration

Integrating new technologies and capabilities with existing platforms presents one of the most persistent challenges in military vehicle projects. The M113 upgrade and the OMFV program highlighted the complexities of merging modern systems—such as weapons, advanced electronics, and extended hulls—with legacy platforms¹⁵. Similarly, the JLTV program had to balance protection, payload, and mobility while integrating seamlessly into existing tactical systems⁶. GAO findings on the OMFV highlighted that integration efforts require clear methodologies, validated data, and objective force structure analyses to ensure reliability and compatibility⁵. Overcoming these challenges requires a holistic approach, involving comprehensive planning, rigorous testing, and proactive risk identification. Integration must be treated as a core element of systems engineering from the outset, ensuring interoperability and compatibility with existing military frameworks.

Designing for Survivability and Protection

The need to design systems that offer superior protection and survivability is a critical challenge for defense engineers. The Bushmaster Infantry Mobility Vehicle was developed to counter IED threats found in conflict zones like Afghanistan and Iraq through its innovative V-shaped hull design². This approach, which required extensive testing and refinement, highlighted the importance of adapting designs based on real-world feedback. Similarly, the JLTV program prioritized survivability against modern threats such as mines and roadside bombs while maintaining essential mobility⁶. GAO assessments of next-generation vehicles emphasize that design choices must accommodate future upgrades to remain effective over time⁵. This underscores the value of iterative design, real-world validation, and flexibility to address evolving combat demands.

The Importance of Test and Evaluation

Effective test and evaluation are critical components of military vehicle capability development and acquisition. Projects such as the Bushmaster Infantry Mobility Vehicle demonstrated that iterative testing and real-world validation are essential for refining designs and adapting systems to combat conditions². Similarly, GAO assessments of U.S. programs like the OMFV highlighted the importance of clear methodologies, data validation, and quantifiable metrics during testing to ensure reliable integration and performance verification⁵. Comprehensive test and evaluation processes help identify and mitigate technical risks early, enhance system reliability, and ensure that military vehicles meet stringent operational requirements before deployment. By prioritizing rigorous testing, defense organizations can achieve higher levels of performance, safety, and mission readiness.

Balancing Cost, Schedule, and Technical Performance

Balancing cost, schedule, and performance is a perennial challenge in military vehicle capability projects. The Land 400 Phase 2 initiative sought to deliver advanced combat reconnaissance vehicles while managing performance specifications within budget and schedule constraints⁴. Similarly, the Bushmaster project experienced cost overruns due to design modifications and evolving needs², while the JLTV program faced cost management challenges related to its ambitious requirements⁶. GAO reviews of next-generation combat vehicles stressed the importance of accurate cost estimation, transparent budgeting, and aligning requirements with available resources to ensure program viability⁵. Systems engineers must engage in transparent communication, risk analysis, and agile decision-making to optimize trade-offs without compromising mission-critical capabilities.

Addressing Technological Obsolescence and Upgrades

Modernizing legacy systems to remain effective in future operational contexts is an ongoing challenge. The ASLAV program sought to extend vehicle lifespans by integrating new technologies across multiple phases³. The U.S. OMFV program, which aims to replace the Bradley Fighting Vehicle, grapples with designing future-proof systems capable of accommodating rapid upgrades⁵. GAO findings emphasized the importance of modular open systems architecture for facilitating future integrations and upgrades, ensuring adaptability to emerging needs⁵. Addressing technological obsolescence requires forward-thinking lifecycle planning, modular design, and continuous technology readiness assessments to keep systems operationally relevant.

Ensuring Reliability and Maintainability

Reliability and maintainability are critical to the operational success of military vehicle systems. The M113 upgrades highlighted how modifying mechanical and electronic components can introduce new maintenance challenges, ultimately affecting operational readiness¹. Similarly, the Bushmaster project encountered significant reliability issues early on, with mechanical failures and manufacturing defects threatening its deployment². These challenges were addressed through close collaboration between defense stakeholders and industry partners, involving iterative testing, design refinements, and improvements to manufacturing processes. This collaborative approach transformed the Bushmaster into a highly dependable platform capable of enduring harsh combat conditions².

GAO assessments emphasized that designing systems for long-term reliability, maintainability, and modularity is essential for reducing lifecycle costs and maximizing operational readiness⁵⁷. To achieve this, there must be a strong focus on reliability engineering during capability development and acquisition, ensuring high levels of system availability and minimizing lifecycle costs. Defense projects should incorporate modular designs for easier repairs, establish robust supply chains, and provide comprehensive training to maintain operational effectiveness throughout the system’s lifecycle.

Common Technical Lessons Across Multiple Vehicle Projects

While each military vehicle project is unique, recurring lessons emerge across programs, including the M113 upgrades, the Bushmaster, the Land 400 Phase 2 initiative¹²³⁴, and U.S. efforts such as the OMFV⁵ and JLTV⁶. Robust systems integration is essential to ensure that new technologies work seamlessly with existing platforms and doctrines. GAO assessments of the OMFV emphasized that transparent methodologies and data validation processes are critical for ensuring reliability⁵. Adaptable and modular designs that accommodate evolving threats and enable upgrades without complete overhauls were highlighted across these projects, with the OMFV’s modular open systems architecture serving as a prime example⁵. Furthermore, the need for disciplined project management and cost-performance trade-offs, as demonstrated by the JLTV program⁶, reinforces the importance of a holistic and agile approach to systems engineering in military vehicle development and acquisition.

Harnessing Lessons for the Future

The challenges encountered in military vehicle capability development and acquisition highlight critical lessons for systems engineers, defense professionals, and technical leaders. Successfully addressing evolving requirements, managing complex integrations, balancing cost and performance, and ensuring long-term reliability are central to delivering effective military vehicle capabilities. Through disciplined requirements management, iterative design, proactive risk mitigation, and comprehensive lifecycle planning, military vehicle systems can be developed with the precision, adaptability, and resilience needed to meet both current and future challenges. By applying these lessons, defense professionals can transform complex projects into mission-ready solutions, ensuring their capabilities remain effective and adaptable to the ever-changing demands of modern conflict.

Empowering Defense Professionals, Technical Leaders, and Systems Engineers through Specialized Education and Training

At the Eggler Institute of Technology, we empower defense professionals, technical leaders, and systems engineers to excel in systems engineering, capability development, and acquisition. Our specialized military vehicle technology education and training course equip individuals with the knowledge, skills, and practical tools to navigate the complexities of military vehicle projects. By focusing on real-world applications, industry best practices, and collaborative approaches, we prepare leaders to drive capability development and acquisition success—ensuring that defense organizations can meet the challenges of today and anticipate the needs of tomorrow. You can learn more about our courses here.

Footnotes

  1. Australian National Audit Office (ANAO) Reports on M113 Upgrades
  2. Australian Strategic Policy Institute (ASPI) Monograph: The Bushmaster – From Concept to Combat
  3. ANAO Reports on ASLAV Program
  4. ANAO Report on Land 400 Phase 2 Procurement
  5. U.S. Government Accountability Office (GAO) Reports on Optionally Manned Fighting Vehicle (GAO-23-106549)
  6. GAO Reports on Joint Light Tactical Vehicle (JLTV) (GAO-20-579).

About the Author

Mark Eggler, BE (Hons), MSc

Mark has over 30 years experience as a senior program manager, project manager and professional systems engineer working on complex military projects.  He has worked for the Australian Department of Defence and international OEMs on large scale military vehicle acquisition programs and now teaches technical leadership, systems engineering and military vehicle technology courses worldwide.

3D Printing: Military Spare Parts Game Changer?

Is Additive Manufacturing A Game Changer For Military Spare Parts Obsolescence?

Keeping military systems up and running is crucial for any defense force, but have you ever considered how challenging it is to get spare parts for decades-old equipment? In many cases, the original manufacturers either no longer supply the parts needed—or worse, they’re out of business. So, what do you do when you need just a handful of these parts? Custom production runs can cost a fortune!

This situation becomes even more critical when you think about how important it is to fix equipment as close to the action as possible. Waiting for parts to arrive through traditional supply chains can take weeks, even months. Imagine the frustration and risk involved when vital systems are out of action for that long.

That’s where Additive Manufacturing (AM) comes into play. AM has the potential to revolutionize the way we handle these challenges. But before we get too excited, there are a few crucial, but often overlooked, issues that need to be addressed.

Material Certification and Performance Consistency

Have you ever wondered how reliable 3D-printed parts really are? It’s a question worth asking, especially in military applications where the stakes are high. The truth is, even though AM has made great strides, ensuring that printed parts consistently meet strict military standards is still a challenge. Achieving uniform material properties across different machines and batches isn’t as straightforward as you might think. And without standardized material certification, there’s always the risk that a part might not perform as expected—especially when it’s mission-critical.

Supply Chain Security and Cybersecurity Risks

What happens when you bring digital files into a traditionally physical supply chain? You open the door to cybersecurity risks. As AM becomes more integrated into defense operations, the reliance on digital files and data transfer increases, which makes these systems more vulnerable to cyberattacks. Could someone steal your IP or, even worse, tamper with your design files? It’s a scary thought, but one that needs serious attention. Robust cybersecurity measures aren’t just a nice-to-have—they’re essential if AM is to be a viable solution for military obsolescence.

Intellectual Property and Licensing Complexities

And then there’s the tricky issue of intellectual property (IP). With so many military platforms relying on old designs, navigating the maze of IP rights can be daunting. What happens if the original manufacturer is no longer around, or if the IP has changed hands multiple times? Using AM to reproduce these parts without established supply contracts might seem like a great workaround, but it’s not that simple. You’ll need to carefully navigate IP laws to avoid infringement. Sure, in wartime, the mission comes first—but those IP issues won’t just disappear when the dust settles.

Summary

In conclusion, while AM offers an exciting solution to the problem of military obsolescence, it’s not without its challenges. By tackling the issues of material certification, cybersecurity, and IP, the defense sector can truly unlock the potential of AM and ensure that our forces are always ready to respond.

If you’re interested in discovering how Additive Manufacturing can benefit your organization, we invite you to explore our course catalog.

We offer a variety of AM courses, including our specialized 3-day ‘Additive Manufacturing for Military Applications’ course. This course lives up to its name, covering essential AM technologies and diving into military-specific topics like Integrated Logistics Support (ILS) considerations, reverse engineering, and the role of AM in obsolescence management. Plus, we bring a 3D printer onsite, giving you practical insights and hands-on experience with the demands of printing parts.

Whether you’re aiming to boost your team’s capabilities or stay ahead in military technology, our courses provide the insights and skills you need to succeed.

 

About the Author

Daniel Eggler, BE (Hons), PhD

Dr Daniel Eggler has over 9 years’ experience delivering educational excellence in the field of mechanical engineering.

In his previous role, Daniel was a highly accomplished Lecturer at the School of Mechanical and Manufacturing Engineering at the University of New South Wales (UNSW). He was the School’s most senior mechanical design lecturer and led the revision of the School’s design curriculum. Keen to ensure theory met practice, he was also the lead academic of the SunSwift Solar Car program at UNSW. In recognition of his exemplary service, Daniel was awarded the UNSW Faculty of Engineering – Educational Excellence & Innovation award in 2019 and 2020.

Daniel brings across his considerable educational and instructional expertise into his current role as the Director of Education and Training at the Eggler Institute of Technology. He is incredibly passionate about delivering superior learning experiences to industry professionals across all specialist technical sectors, particularly Defense. He is deeply committed to redefining the impact of technical education, synergizing innovative software and evidence-based teaching methods to empower all who undertake studies with EIT.

Daniel graduated from UNSW with first class honors in Mechanical Engineering. He went on to complete his doctorate in Mechanical Engineering, specializing in acoustics, vibration, vibro-acoustics and active noise control, cloaking and illusions.

Tips For Better Project Technical Definition

Improving Front-end Technical Defintion of Complex Projects

Acquisition of modern, complex military systems is generally a difficult process.  Recent history is littered with numerous examples of military projects that have failed to deliver. And unfortunately, many of these projects ultimately end up being cancelled with considerable losses in time, money and reputation to all involved.  What is so galling about all this massive waste is that it is usually completely avoidable. So let’s take a few minutes to understanding one of the most regularly occurring problems and describe some actions that can be taken to mitigate against it.

Inadequate project and requirements definition

This problem is regularly cited as the most common cause of project problems leading to cost overruns and schedule delays. The key driving issue here is the lack of time invested in adequately defining the key operational and technical requirements of the project.  This fundamental part of the project process often lacks analytical rigor and always seems to be deprived of enough time and money.  Depending on the complexity of a military program, one should be investing around 3% of the systems engineering budget to getting this project phase correct.

You probably think this is a relatively easy and straight forward issue to deal with but you are wrong.  For some reason, both government and defense companies struggle to get this fundament step right.   In dealing with this fundamental problem, it is wise to always invest a considerable amount of effort in developing a well-crafted Operational Concept Document (OCD).  The OCD – as it is commonly referred to – correctly captures the key operational requirements, systems functionality and technical risk associated with the project.  If prepared correctly, it forms the capstone document of the project and provides a strong foundation for building and delivering a successful military program.  The problem is OCDs are rarely worth the paper they are written on.  Why is this I hear you say!

Improving Operational Concept Documents

Well, the primary reason is that developing an effective OCD requires considerable professional skill in project-related military technology, high levels of operational and technical experience and an excellent grounding in a method to develop the document and its associated artifacts.  The sad truth is that few people develop the unique combination of these skills.  And its unlikely one will develop such skills as part of a normal professional career in government, the military or engineering practice.

So what’s the solution to this problem? Firstly, go and find a consulting or training company or someone in your organization that has developed at least three OCDs for moderate to high complexity systems. Once someone has been involved in developing at least three of these documents you can have some assurance that they know what they’re doing (but not always). The problem is you are unlikely to find such a person if you work in government.  Another good alternative is to hire a good training organization that can teach your team the essential knowledge and skills needed to develop effective OCDs.

Secondly, make sure the consultant or training organization has a properly documented methodology to support OCD development.  Such a method should involve all stakeholders and have a clearly defined process to correctly elicit requirements and a suitable database to capture the inputs and outputs of the process.  A reliable and proven technique involves the use of scenario driven workshops to elicit and capture operational requirements, measures of effectiveness and critical technical parameters.  Experience has shown that four to five workshops are usually sufficient to capture enough information to allow development of a good OCD.

And finally, the best way to maximize the effectiveness of the OCD development process is to make sure all people are trained if the OCD development method.

If you follow these few simple suggestions, then you can have some confidence that you’ll be able to develop a good OCD and your project will get off to the best possible start.

To learn more about the Eggler Institute of Technology’s specialist systems engineering courses and project management courses addressing this important issue, please visit our course catalogue.

About the Authors

Mark Eggler, BE (Hons), MSc, CPEng.Mr. Mark Eggler. Mark has over 30 years’ experience as a senior project manager, professional engineer and teacher of systems engineering, military vehicle technology and leadership courses. Mark has developed more than 30 courses covering different aspects of military technology which he delivers worldwide. He is also a visiting fellow at the University of New South Wales, Australian Defence Force Academy.

MOTS Acquisition: It’s Easier Isn’t It?

Military-Off-The-Shelf  (MOTS) Acquisition: It’s Easier Isn’t It?

By now you’ve probably heard it a thousand times over. ‘Buy MOTS and project schedule, technical and cost risk will evaporate’.  It’s a very seductive mantra in wide use throughout the world today.  But is it true?  And is it applicable to complex technology acquisition?

For all force development and acquisition professionals, understanding the key issues of the MOTS vs Development debate is essential to developing the correct acquisition strategy for complex military technology projects.

Key Point #1

It is important to recognise that most MOTS technologies are manufactured and developed to meet mission/user requirements (including tactics, techniques and procedures, TTPs) that are likely to differ from those of the acquiring country.  This fact produces design solutions that match the military culture and war fighting methods for which the technology was originally designed.

Now for militaries with similar war fighting doctrine and TTPs this shouldn’t pose a big problem.  But where this isn’t the case, acquirers of complex MOTS systems need to appreciate this fact and plan accordingly. Early trialing of military systems should discover such mismatches between offered designs and the user’s Tactics Techniques & Procedures (TTP).  Discovering such issues when in contract is usually costly and can cause significant schedule delay.

Key Point #2

Good reliability performance of military systems is a key component of mission success.  In fact, achieving good reliability is one of a project’s key technical requirements that must be planned for early, takes time to verify and consumes significant resources.

But we’re buying MOTS and we don’t need to worry about reliability’, I hear you say.  Don’t be fooled.  Reliability performance is strongly correlated to the operational environment of the military vehicle system.  For instance, if a military system’s mission profile used in the original design process emphasized cold/wet operations, then you can be confident that a MOTS system should achieve claimed reliability in a similar environment.

But for other environments – such as hot/wet – this isn’t likely to be the case.  The reason for this is that failure modes in equipment are dependent on the operational environment. Thus, operating MOTS technology in a new operational environment is likely to reduce reliability performance.

So to avoid poor reliability performance and its negative effects on mission availability and life-cycle cost, plan to do reliability testing as part of your MOTS systems engineering program.

Key Point #3

Another common headache encounter during complex MOTS programs concerns the systems integration of C4ISR systems.  Quite often the integration of these systems involves either current in-service equipment or new systems that the MOTS solution was not designed for.  Commonly encountered technical problems arise in the areas of electrical power budget, EMC/EMI interference, radhaz, and lack of suitable installation space.

Unfortunately for militaries acquiring MOTS technology, there is no simple solution to this problem.  The cost and schedule impacts of systems integration can be reduced by requiring tenderers to confirm technical feasibility of integrating C4ISR systems prior to contract signature. Providing the acquirer has clearly specified the systems to be integrated, then this risk can be readily transferred to the prime contractor.

To learn more about the Eggler Institute of Technology’s specialist systems engineering and project management courses addressing this important issue, please visit our course catalogue.

About the Author

Mark Eggler, BE (Hons), MSc, CPEng. Mark has over 30 years experience as a project manager and professional engineer working on complex military vehicle projects.  He has worked for the Australian Department of Defence and international OEMs on large military vehicle acquisition programs and teaches technical leadership, systems engineering and military vehicle technology worldwide.

Combat Vehicle Mobility: Tracks or Wheels?

For years you have probably heard – even been involved in – the never ending debate of ‘wheels vs tracks’ for combat vehicle applications.   This debate, which has often been ill-informed, has assisted little in understanding the key issues.  In this article, I will focus on some key facts concerning this matter and leave it to you to draw your own conclusion as to whether armies should invest in tracks or wheels for its combat vehicles.

Today, vehicle mobility is usually described by reference to obtuse metrics such as Nominal Ground Pressure (NGP), Vehicle Cone Index (VCI) or Mean Maximum Pressure (MMP).  These metrics, which are still widely used and spoken about, were developed well over 50 years ago in the US and UK.  Some of the key problems with these metrics are:

.   NGP whilst very simple to use offers no relationship between it and soil properties – a major problem when trying to determine vehicle mobility;

.   VCI was developed by the US in the 1950s based on large scale trials of vehicles operating in different soil conditions.  The results of this testing were used to empirically develop a factor know as the ‘Mobility Index’ and this value is used to derive wheeled and tracked vehicle VCI from charts.  The principal problem with VCI is that it uses a very complex set of vehicle parameters and is based on data from tests conducted on vehicle designs of more than 50 years ago.

This situation has reduced the credibility of VCI as an accurate indicator of vehicle mobility.  Incidentally, VCI is the key algorithm imbedded in the NATO Reference Mobility Model (NRMM).  Wong (2009) has recently written at length about the deficiencies in the NRMM, particularly related to the key track vehicle design parameters of wheel configuration, track tension and suspension design.

Roughly at the same time as the US were developing VCI, the UK developed its own metric for predicting tracked and wheeled vehicle mobility – Mean Maximum Pressure (MMP). MMP is considered easier to use and provides a more robust and reliable indicator of tracked vehicle mobility.  However, the use of MMP to calculate wheeled vehicle mobility is questionable and the validity of MMP was never verified by test. Any Army assessing the merits of wheeled vehicle mobility on the basis of MMP should exercise considerable care when interpreting the results.

More recently the UK has developed through an experimental program, the Vehicle Limiting Cone Index (VLCI). This is similar to VCI but calculated using what many today consider to be a more simple and accurate method. VCLI can be used with more confidence to calculate wheeled vehicle mobility. This result suggests that a strong case exists to review the traction models used in the NRMM.

Analysis undertaken by Ogorkowitz (2000) using the VCLI of 35 wheeled armoured vehicles in the weight range 8-40 ton is revealing. His analysis of these wheeled armoured vehicles operating in soft clay-like soils (Cone Index < 200kPa) shows that only the 4 lightest vehicles (< 13.5 ton) could move over this terrain.  When these wheeled vehicles reduced tyre inflation pressures to the ‘emergency’ setting to maximize mobility, only vehicles weighing less that 20t could pass over the soft, wet soil.

And remember at this tyre inflation setting vehicle movement is limited to speeds of around 20 km/h – not a great situation to be in if you are operating in a hostile environment.  This means that the best designed 6×6 and 8×8 wheeled armoured vehicles will need to weigh less than 20t if they’re to provide good tactical mobility. Given the threats on the battlefield today and the increasing shift towards higher levels of ballistic and blast protection, how many serious 6×6 and 8X8 armoured wheeled vehicles weigh less than 20t.

I’ll now let you make your own mind up over the merits of wheels vs tracks for combat vehicles needing to operate in soft soils.

To learn more about the Eggler Institute of Technology’s Military Vehicle Technology & Mobility courses, please visit our course catalogue.

About the Author

Mark Eggler, BE (Hons), MSc, CPEng. Mark has over 30 years experience as a project manager and professional engineer working on complex military vehicle projects.  He has worked for the Australian Department of Defence and international OEMs on large military vehicle acquisition programs and teaches military vehicle technology worldwide.

 

Military Hybrid Electric Drive Vehicles: Power Density is Paramount!

The information contained in this article is drawn from Eggler Institute of Technology short course: Introduction to Military Hybrid Drive Electric Vehicles.

Hybridisation is being pushed more than ever in today’s climate. Availability of fossil fuels is becoming increasingly scarce, whilst cost per gallon is rising. This places a greater emphasis on fuel economy.

The military is not exempt from this phenomenon, legally or logistically. Whether it is adhering to the latest US or European emission standards or pushing to get more range on a vehicle during operations, fuel economy is very desirable. So why is it that unlike the civil sector, military hybridization appears almost completely stalled?

As a matter of fact, the military has been chasing hybridization for years. As early as the 1940s, the US military converted a T-23 medium tank to an electric drive, although the electrification was abandoned after WWII, reverting back to mechanical and hydraulic drives (Khalil, 2009). This is not an isolated event with efforts to field electric/hybrid vehicles occurring regularly around ever 10 years. Yet to this day there is virtually no market presence for hybrid electrics in the military vehicle scene. This begs two very big questions – why militaries continue to pursue hybridization and what is stopping them.

There are many advantages to hybridization. Some of these include onboard power generation, reduced acoustic signature, silent operation, peak torque at zero speed that provides a significant lift to vehicle mobility and power regeneration.

However, let’s focus on what many military planners picture as the ultimate hybridization advantage – fuel economy and associated cost savings.

Military fossil fuel usage generates a serious logistic burden. This burden can range from 30-80 percent of convoy loads getting fuels to operational units, which not only dramatically increases costs but operational risks as well (Kramer et al, 2011).

According to Gen. Conway of the US Marine Corps, even though the military can purchase fuel around US $1 per gallon, it costs a further US $400 to transport it to the theatre of operations (Rosenthal, 2010). This is a staggering number. It becomes immediately apparent how increasing fuel economy would drastically decrease logistic costs and allow for more versatility in convoy load configurations.

There is limited publicly available information on what has been done to test fuel economy of hybridized military vehicles. This stems from the difficulties encountered when conducting such tests. Fuel economy is usually verified by computer simulated duty cycles (Butler, 1999). These are predetermined scenarios that simulate engine conditions during highway driving, suburban driving and so on.

However, the nature of military operations has many more requirements comparatively to a commercial vehicle.  Thus, generating military duty cycles is much more difficult as no standard is easily agreed upon (Antoniou, 2007).

There is evidence to suggest that by optimizing the hybridization configuration, light to medium vehicles could benefit from a 45.2% increase in fuel economy, with a 15% gain for heavy class vehicles (Goering et al, 2003).

Yet despite these impressive numbers there is still no presence of hybridized military vehicles. This is due solely to a hybrid’s available power density.

During operations, a military vehicle’s instantaneous power requirements are paramount. The ability to accelerate quickly and have 60% gradeability performance are crucial for military vehicles to provide high levels of tactical mobility.

Unfortunately, the technology is not there yet. Military hybridization utilizes commercial heavy vehicle technologies that are adapted for military use. These technologies, particularly high-power density, lightweight batteries, cannot meet the broad operational and environmental rigors of combat operations. So short of a major technological breakthrough, the current situation of military vehicle hybridization is expected to remain static for at least another decade.

I would like to leave you with this final thought. Until such time the power density of hybrid configurations rivals that of its mechanical/hydraulic counterparts, military HEVs will continue to remain an elusive possibility.

If you would like to learn more about the current state of technical development impacting military vehicle technology and military hybrid-electric drives, I encourage you to enroll in the Eggler Institute of Technology’s world leading Diploma of Military Vehicle Technology.

About the Author

Mark Eggler, BE (Hons), MSc, CPEng. Mark has over 30 years’ experience as a project manager and professional engineer working on complex military vehicle projects.  He has worked for the Australian Department of Defence and international OEMs on large military vehicle acquisition programs and teaches military vehicle technology worldwide. You can contact Mark here.